By bigorna1 on Skatehive
This post is a follow up on these previous two: https://ecency.com/hive-114308/@bigorna1/finally-being-productive and https://ecency.com/hive-114308/@bigorna1/making-more-progress I promised a follow up on this project about 3 months ago and life kept on getting in the way, so finally I find a moment to recap a conclusion post. the main frame was passed on to a friend carpenter to have the doors fitted to it on both sides. 2 doors on each side, 4 in total. after he did his deed, I start mounting the pieces into the massive and heavy structure that it becomes with every component added. once this is all done, there are a few more things to follow. first, I wrap protect the main frame for transport and possible rain since now, even if I could lift it, it wouldn´t fit through the door. second, I add a couple of traversal beams for the loading and unloading unto the truck, to avoid possible scissor movement from snapping the whole thing. and third, I cut 10cm off of the bottom of both main